Date: 02/03/2007 Time: 12:01am - 02:00am EST On February 3 at 12:01am EST (GMT -5) our service provider will be performing scheduled maintenance to upgrade all production systems. The upgrade will take approximately 1-2 hours. This update is unavoidable as it fixed number of security holes that were discovered in mainstream operating system kernels. Estimated downtime for all accounts should not exceed 30-60 minutes. We apologize for possible inconvenience. For the non-techies...that means no dynin' from 12-2 tonight. Very Happy
Bryan, You still have not explained that little rectangle picture at the bottom of your posts. Daniel
Daniel...that's the server load. I put it up so I can monitor loads while posting/browsing/etc. the site. Jim...yep...the server load is really 0. Very Happy
What can be done to give the server a real workout, to test its full capability under load, kind of like the Hydrodyne Wheelie with the 2Mercs Dyne??? How can we all meet digitally here in Hydrodyners.com cyberspace and see what kind of wheelie the server can do?